The Background
A North Sea operator contacted Dron & Dickson with an urgent request for assistance following an unplanned outage due to major Corrosion Under Insulation (CUI) issues on an FPSO. The existing trace heating system was almost 20 years old. A speedy resolution was required to install a fully functional, compliant and fit-for-purpose system, limiting production downtime.