The Project
Dron & Dickson moved into action to arrange immediate production of all nonspecial products from our manufacturer partner Orga BV in Holland. During this time our engineer mobilised to survey the vessels helideck.
The system was designed from the resultant survey report, and non-standard products procured, manufactured and delivered to the Subsea7 vessel whilst still in dock.
A specialist installation team was mobilised during a planned port call in Tenerife. The system installation and commissioning were successfully completed during the transit to West Africa.