The Project
Dron & Dickson provided a 3 man Rope Access team, with the support of onshore project management.
- Suitable plot plan and layout drawings were made available to ensure the work instruction covered all areas and to allow suitable red line mark-up of barriers and areas of concern
- Where appropriate, the use of secondary retention stainless steel wires were utilised as a means of making safe potential dropped objects
- Particular attention was taken in areas of high traffic (walkways) and included
- Items over 7 Kilogrammes at a height of 2 + meters
- Items over 3 Kilogrammes at a height of 4 + meters
- Items with a single point of retention
- Unistrut and tertiary steel supports
- Scale on structural steel was removed to deck level
- Loose redundant items such as tools, instruments and strops were removed to deck level
On completion of the survey we provided a plot plan marked up to show barriers and areas of concern to the OIM, OCM, E&I Team Lead and the OIE for further investigation.